Here the underside of the deck is having epoxy and paulownia dust wood glue applied to the rail area and to the frames with a squeeze bag ( ziplock bag wth the corner cut out ) A slow resin has been chosen because of the warm weather.
Lowering the first frame panel on to the deck
Now for the palletload of bricks, and couple of clamps for the nose.