The Baron 12 foot wooden surfboard project part 7
Here the tunnel and boomerang flex fin are being coated with resin, 3 coats so far. A couple of keel fins being done at the same timeThe second internal frame panel pieces being cut and fittedHere's the finished frame panel, next to the deck panel which is being cut and fittedThe deck is only 5.5mm thick so has cloth and resin reinforcement underneath
Labels:
The Baron project 7