The Baron 12 foot wooden surfboard project part 8

Here the underside of the deck is having epoxy and paulownia dust wood glue applied to the rail area and to the frames with a squeeze bag ( ziplock bag wth the corner cut out ) A slow resin has been chosen because of the warm weather.Lowering the first frame panel on to the deckNow for the palletload of bricks, and couple of clamps for the nose.